Installation Guides

Installation guides cover the site information that should be checked before movable partition panels arrive. Topics include clear opening dimensions, overhead support, track routes, ceiling coordination, stacking areas, access and practical panel handling. The articles help contractors and project teams understand which interfaces need confirmation between the partition supplier, structural support, ceiling work and finished room. They do not replace approved shop drawings or site inspection. Use this category to prepare an installation-readiness checklist, identify missing information and reduce avoidable coordination gaps. For a project review, share the layout, opening width and height, ceiling condition and intended stacking direction with EBUNGE.

Need Help Planning a Movable Partition Project?

Share the opening size, room layout, intended use and available drawings. EBUNGE can review the information before system coordination and quotation preparation.

Contact EBUNGE