Why Stacking Pockets at Truss Wells Demand Early Drawing Review

When a convention center project includes movable partitions that park inside floor-mounted truss wells, the convention center partition stacking pockets truss wells become a coordination point that touches structure, ceiling, and floor layout. The exact route, junction arrangement, continuous overhead path and parking position must be confirmed from the coordinated project drawings. The drawings that specify these pockets must show not only the pocket itself but also the overhead track path that feeds it.

EBUNGE movable wall panels are individually movable and suspended from a top track. They cross an opening without a floor track, and they park at a planned stacking position. That means the pocket is not a floor-guided slot; it is a volume in plan and section where panels rest when not in use. For a floor-mounted truss well, the pocket may be integrated into the well structure or adjacent to it. The drawings must clarify how the overhead track connects to the pocket and how the panels navigate any turn.

Project teams often assume that a stacking pocket is simply a recess in the wall. In reality, the pocket dimensions, the track route, and the stacking sequence are all interdependent. The suitability of each route and parking arrangement depends on the approved layout, circulation, ceiling interfaces and operating sequence. Early drawing review helps confirm that the pocket is feasible within the available space and that the panels can move into it without obstruction.

Wood-based movable partition panels shown at a commercial project site
EBUNGE movable partition planning reference.

Core Drawings That Define Stacking Pockets

Several drawing types work together to specify a stacking pocket at a truss well. Each contributes a different layer of information, and none can be read in isolation.

Floor Plans and Reflected Ceiling Plans

The floor plan shows the pocket footprint and its relationship to the truss well. It indicates where the pocket begins and ends, and how it aligns with the partition opening. Since EBUNGE panels are top-hung, the RCP must display the continuous track from the storage position to the closed position. If the route includes a turn, the RCP should show the curve or switch mechanism, though the exact hardware is project-specific.

Sections and Elevations

Share the opening dimensions, room layout and intended operating sequence for review.

Send the Coordination Information

Sections cut through the truss well and pocket to reveal vertical clearances. They show the height of the pocket, the depth of any recess, and the relationship between the top track and the ceiling structure. Elevations help visualize how the panels stack against each other and how they align with the finished wall surface. For a floor-mounted truss well, sections also clarify how the pocket interacts with the well’s base and any access panels.

Track Route and Stacking Diagrams

EBUNGE emphasizes that straight, turning, and stacking routes are reviewed from the layout. This diagram shows the path panels travel from the pocket to the closed position, including any turns. It also indicates the stacking sequence—how many panels park in a given depth and whether they stack in a straight line or in a compact arrangement. The stacking diagram must match the pocket dimensions shown on the floor plan.

Coordination with Floor-Mounted Truss Wells

When a stacking pocket is located at such a well, coordination becomes critical.

Structural Interfaces

The truss well may contain columns, beams, or bracing that limit the pocket’s depth or width.

Service Routing

Truss wells often carry HVAC ducts, electrical conduits, or plumbing. These services may need to pass through or around the pocket area. The drawings should indicate service routes and any required offsets. If a duct crosses the pocket, the panel stacking depth may need to be reduced or the pocket relocated. The project team must confirm that the pocket does not interfere with service access or maintenance.

Floor and Ceiling Tolerances

Because EBUNGE panels do not use a floor track, the floor surface within the pocket does not need a guide channel. However, the floor must be level enough for the panels to hang plumb. The drawings should specify floor flatness tolerances, though exact values are project-specific. The exact overhead route and support arrangement must be confirmed by the responsible project team from coordinated drawings.

Documentation Needed for EBUNGE Review

EBUNGE can discuss pass-door requirements and project documentation, but each project requires its own confirmation. To initiate a review, the project team should prepare a set of documents that clearly describe the intended layout.

Architectural Layout Drawings

Provide floor plans and RCPs that show the partition runs, the stacking pocket, and the truss well. Include dimensions and notes about ceiling heights and floor finishes. These drawings help EBUNGE understand the spatial context and propose a parking style that suits the layout.

Structural and MEP Overlays

This may include composite drawings or separate files that can be compared. The goal is to show where the pocket and track route intersect with beams, ducts, or conduits.

Project-Specific Requirements

EBUNGE offers finishes including laminate, melamine, fabric, leather, glass, and other approved surfaces. The documentation should specify which finishes are desired for the panels and any matching surfaces within the pocket.

Acoustic and Finish Considerations in Stacking Pockets

Project layout drawing showing the movable partition route and stacking position
EBUNGE movable partition planning reference.

The drawings should show how the pocket is sealed or how the panels close against it.

Acoustic Sealing at the Pocket

These ratings are not a simple decibel count; they are derived from tests across multiple frequencies. The drawings should indicate where perimeter seals are placed and how they compress against the pocket faces. However, the exact seal materials and performance values are project-specific and must be confirmed with EBUNGE.

Finish Selection and Durability

Review the ceiling interface, panel route and stacking position together.

Request a Drawing Review

Visible references can support layout discussion but do not verify hidden construction or performance. Laminate and melamine offer a range of colors and textures, while fabric and leather add warmth but may require more care. The drawings should specify the finish type and any edge treatments.

Common Pitfalls in Stacking Pocket Drawings

Even experienced project teams can miss details that later cause delays. Here are common pitfalls to avoid.

Insufficient Pocket Depth

The pocket depth must accommodate the number of panels and their stacking method. If the drawings show a pocket that is too shallow, panels may protrude or fail to park fully. The stacking diagram should be checked against the pocket dimension.

Unclear Turning Radius

A tight turn may require a wider pocket or a different stacking arrangement.

Missing Coordination with Ceiling Structure

The top track needs a support structure. The drawings should show the track suspension points and the ceiling framing.

How to Proceed with Your Project

To ensure that your convention center partition stacking pockets at truss wells are properly specified, start by gathering your architectural and engineering drawings. Review them for the elements described above, and identify any gaps. Then contact EBUNGE to discuss your project-specific requirements.

EBUNGE can provide guidance on track routes, stacking configurations, and finish options. They can also review your documentation to confirm that the proposed layout is feasible.

Frequently Asked Questions

What is a stacking pocket for a movable partition?

A stacking pocket is a recess or designated area where movable partition panels park when not in use. It is typically shown on floor plans and sections, and it must align with the overhead track route.

Do EBUNGE partitions require a floor track?

No, EBUNGE movable wall panels are top-hung and move without a continuous floor running track or floor hardware along the partition line. This allows for a clear floor when the partition is open.

What drawings are most important for specifying a stacking pocket at a truss well?

The most important drawings are the floor plan, reflected ceiling plan, sections, and a dedicated track route or stacking diagram. These show the pocket dimensions, the overhead track path, and how panels park.

Movable partition wall installed in a commercial interior project in Thailand
EBUNGE movable partition planning reference.

Can EBUNGE partitions turn corners into a stacking pocket?

EBUNGE reviews straight, turning, and stacking routes from the layout.

What finish options are available for EBUNGE panels?

EBUNGE offers laminate, melamine, fabric, leather, glass, and other approved surfaces. The choice of finish can affect aesthetics and maintenance, so it should be specified in the project documentation.

Conclusion and Next Steps

Specifying convention center partition stacking pockets at floor-mounted truss wells requires a coordinated set of drawings that address structure, services, and track routing. Cost and maintenance requirements depend on the selected configuration, finish and project conditions and require project-specific confirmation.

EBUNGE is ready to discuss your project documentation and pass-door requirements.

Continue Exploring

More Cost and Planning Guides

View all Cost and Planning guides