When planning an operable wall for an auditorium with a raked floor, the auditorium partition stacking drawings are arguably the most important set of documents you will review. These drawings show how each movable panel leaves the opening, travels along the overhead track, and parks in a designated stacking area. On a sloped floor, the absence of a floor track means every panel is suspended from the top track, so the geometry of the ceiling, the track layout, and the stacking zone must be coordinated precisely. This article explains what drawings you should request and what details to check before procurement.

Why Stacking Drawings Matter on Raked Floors
Raked floors are common in lecture halls, theaters, and multipurpose auditoriums. The slope improves sightlines but complicates operable wall installation. Because EBUNGE movable wall panels are individually movable and suspended from a top track, they cross the opening without a floor track. That means the panels do not need to follow the floor slope, but the track must be level and the stacking area must accommodate the panels’ length and height without interfering with seating or lighting.
The Role of the Top Track
The top track is the primary support and guidance for each panel. On a raked floor, the track is typically installed level, often hidden in a ceiling soffit or behind a decorative fascia. The stacking drawings must show the track path from the opening to the parking position, including any curves or switches.
No Floor Track – What That Means for Design
Since there is no floor track, the panels are free from floor-mounted guides. This simplifies the floor finish and avoids tripping hazards. However, it also means the panels must be stiff enough to resist sway and maintain alignment. The drawings should indicate the suspension points and any stabilizers (though not their materials) to ensure safe operation.
Key Drawings for Auditorium Partition Stacking
To evaluate the feasibility of a movable wall in an auditorium, you need a set of drawings that cover the entire path from opening to stacking. Here are the essential ones:
Share the opening plan, stacking position and fixed obstructions.
Plan View of the Stacking Layout
This drawing shows the auditorium from above, with the opening, the stacking area, and the track path. It must indicate the length of each panel and the total stacking depth. On raked floors, the stacking area is often at the rear or side of the room, where the floor is higher. The plan must show clearances to seats, columns, and other obstructions.
Elevation View of the Stacking Pocket
An elevation drawing of the stacking area is crucial. It shows the height of the panels, the ceiling height, and how the panels will be stored. If the stacking area is recessed, the drawing must show the pocket dimensions and the track support structure.
Track Section Details
Cross-sections through the track at critical points (e.g., at the opening, at a curve, and at the stacking area) reveal the track profile, the hanger spacing, and the connection to the building structure. These details are essential for structural coordination.
Turning and Stacking Route Drawings
If the stacking area is not directly in line with the opening, the panels must turn. The drawings must show the turning radius and any switches or turntables. EBUNGE reviews straight, turning, and stacking routes from the layout, so these drawings must be accurate.
What to Check in the Stacking Drawings
Reviewing drawings is not just about seeing the lines; it’s about verifying that the design will work in the real building. Here are key checks:
Stacking Depth and Panel Width
Each panel must fit within the stacking area without overlapping critical elements. The drawings should show the accumulated width of all panels when stacked. If the stacking area is too small, panels may protrude into circulation paths.
Clearances to Seating and Structure
On a raked floor, the stacking area may be at a different level than the opening. The drawings must show vertical clearances to the floor, ceiling, and any stepped seating. There must be enough room for the panels to be pulled out without hitting seats or lights.
Pass-Door Integration
If a pass-door is required in the movable wall, the stacking drawings must show how the pass-door panel is handled. Typically, the pass-door panel is wider and heavier, so the track and stacking must accommodate it. Confirm that the pass-door swings correctly and does not obstruct the stacking sequence.
Acoustic Considerations in Drawings
Acoustic performance is a key reason for installing an operable wall in an auditorium. While this article focuses on drawings, the stacking layout can affect acoustics. For example, if the stacking area is not fully enclosed, sound may flank around the panels. The drawings should indicate perimeter seals and their compression at the head, jambs, and floor. However, do not rely on drawings alone; confirm acoustic requirements with the manufacturer.
Seals and Gaskets
Perimeter seals are essential for acoustic isolation. The drawings should show the type and location of seals, but the actual material is a manufacturer decision. Ensure that the seals are continuous and that the stacking operation does not damage them.
STC/Rw Ratings – A Conceptual Note
Sound Transmission Class (STC) or Weighted Sound Reduction Index (Rw) are ratings that indicate how much sound is reduced. They are not a direct count of decibels, but rather a standardized rating. The stacking drawings do not determine the rating, but the installation details do. Always request acoustic test data from the manufacturer for the specific wall configuration.

Documentation to Request from the Manufacturer
When you procure an operable wall, you should receive a set of documents that go beyond the basic drawings. Here’s what to ask for:
Approved Shop Drawings
These are the manufacturer’s detailed drawings that show the final design, including all dimensions, track profiles, and stacking details. They should be stamped as approved by the project team.
Review the full panel route and parking footprint.
Installation Manual
This document describes how to install the wall, including the track suspension and panel assembly. It should be reviewed by the general contractor.
Operation and Maintenance Manual
This manual explains how to operate the wall, including the stacking sequence and any maintenance requirements. It is essential for the building owner.
Coordination with Other Trades
An operable wall does not exist in isolation. The stacking drawings must be coordinated with other building systems:
Structural Coordination
The top track must be supported by the building structure. The drawings must show the loads and the support points. The structural engineer must review these loads.
MEP Coordination
Lighting, HVAC, and sprinkler systems must not interfere with the track or the stacking area. The drawings should show the clearances to these systems.
Ceiling and Finish Coordination
The track is often hidden in a ceiling. The stacking drawings must align with the ceiling layout, including access panels for maintenance.
Common Pitfalls in Auditorium Stacking Drawings
Avoid these mistakes when reviewing drawings:
Insufficient Stacking Depth
Designers sometimes underestimate the space needed for stacking, especially when panels have different widths. Always verify the total stacking dimension.
Ignoring the Rake
The floor slope can affect the clearance under the panels. Even though there is no floor track, the bottom of the panels must not hit the floor when they are moved. The drawings must show the minimum clearance at the lowest point of the rake.
Overlooking Pass-Door Swing
A pass-door that swings into the stacking area can obstruct the movement of other panels. The drawings must show the door swing and ensure it does not interfere.
How EBUNGE Supports Your Project
At EBUNGE, we review your auditorium layout to plan straight, turning, and stacking routes. We can discuss pass-door requirements and provide the project documentation you need, including layout drawings, installation details, and operation manuals. Our movable wall panels are individually movable, suspended from a top track, and cross the opening without a floor track. We offer a range of finish options, including laminate, melamine, fabric, leather, glass, and other approved surfaces.
To get started, contact us with your floor plans. We will work with you to ensure your auditorium partition stacking drawings are accurate and buildable.
FAQ
What is the most important drawing for auditorium partition stacking?
The plan view of the stacking layout is critical because it shows the track path, panel lengths, and stacking area. It must be coordinated with the raked floor and seating.
Can an operable wall work on a raked floor without a floor track?
Yes, EBUNGE movable wall panels are suspended from a top track and cross the opening without a floor track. This makes them suitable for raked floors, provided the top track is level and the stacking area is designed correctly.
What should I check in the stacking drawings regarding the pass-door?
Check that the pass-door panel is accounted for in the stacking sequence, that its swing does not interfere with other panels, and that the track supports its weight.
How do acoustic seals affect the stacking layout?
Seals are located at the perimeter of the wall. In the stacking area, the seals must not be compressed or damaged when panels are parked. The drawings should show seal locations and clearances.
What documents should I request from the manufacturer?
Request approved shop drawings, installation manual, and operation/maintenance manual. Also ask for acoustic test data if needed.
For the next planning step, review the related EBUNGE guide, review selected projects and confirm the opening, ceiling condition, layout, finish direction and acoustic requirement for the project.
Conclusion

Auditorium partition stacking drawings are essential for a successful operable wall installation on a raked floor. They ensure that panels move smoothly, stack safely, and maintain acoustic integrity. By reviewing the plan, elevation, and section details, and coordinating with other trades, you can avoid costly mistakes. EBUNGE is ready to assist with your project. Contact us today to discuss your requirements and obtain the necessary documentation for your auditorium.
Continue Exploring
More Operable Wall System Guides
- Newer guideHow to Plan Manual Operable Wall Stacking for Auditorium Backstage Storage Areas
- Earlier guideWhy Manual Operation Planning Differs for Auditorium Operable Walls vs Classrooms
- Related guideHow to Plan Hotel Banquet Partition Stacking Around Ceiling-Mounted Rigging Point Swings
- Related guideHow to Plan University Training Room Partition Manual Operation with Wall-Mounted Display Screen Swings