When planning a sports hall, the sports hall partition stacking pockets time clock drawings are not just a technical detail—they are a coordination tool that links architecture, acoustics, and daily operations. For procurement teams, these drawings define how the movable wall system will be integrated into the building structure and how the wall-mounted time clock interface will control access or scheduling. This article explains what to look for in these drawings, how they support the tendering process, and why early coordination prevents costly changes.

Understanding the Role of Stacking Pockets in Sports Hall Partitions
Stacking pockets are recessed areas in the wall or ceiling where movable partition panels park when not in use. In a sports hall, these pockets must accommodate panels that may be taller and wider than standard office partitions. The drawings for these pockets must show exact dimensions, structural support, and clearances for the panels to move freely.
Why Stacking Pockets Matter for Procurement
For procurement, stacking pocket drawings affect the building envelope, fire compartmentation, and interior finishes. If the pocket is not correctly dimensioned, the panels may not stack fully, reducing the open area. Drawings must specify the pocket depth, width, and height, as well as the location of the top track and any blocking required for support.
Straight, Turning, and Stacking Routes
Each sports hall layout has unique movement paths for the partition. Drawings must clearly show straight runs, turning sections, and the stacking area. The sports hall partition stacking pockets time clock drawings should include plan views with arrows indicating panel movement, and elevation views showing the track and pocket relationship. This helps installers and contractors understand how the system operates.
Wall-Mounted Time Clock Interfaces: What to Specify
A wall-mounted time clock interface is often used in sports halls to schedule when the partition is opened or closed, or to control access to different zones. The drawings must show the exact location of the time clock, its electrical supply, and how it interfaces with the partition control system. This is not a standard electrical outlet; it requires coordination with the partition manufacturer.
Share the opening plan, proposed stacking position and nearby fixed obstructions for a layout review.
Electrical and Data Drawings
Electrical drawings must indicate the power source for the time clock and any low-voltage wiring for control signals. Data drawings may show network connectivity if the time clock is part of a building management system. These drawings must be reviewed alongside the partition drawings to ensure that the interface is compatible.
Integration with Partition Controls
The time clock interface may trigger the partition to move automatically or simply provide a visual reminder. Drawings should show the control panel location and how the time clock connects to it. For procurement, it is essential to specify the type of interface (e.g., dry contact, digital) and the protocol, but always confirm project-specific requirements with the manufacturer.
Key Drawings in a Sports Hall Partition Specification
Several drawings are typically required for a complete specification. These include floor plans, reflected ceiling plans, elevations, sections, and detail drawings. Each serves a specific purpose in the procurement and installation process.
Floor Plans with Stacking Pockets
Floor plans must show the location of each stacking pocket, the partition path, and the parking positions. They should also indicate the clearance required for panel movement and any obstructions like columns or doors. The sports hall partition stacking pockets time clock drawings often combine this information with time clock locations.
Reflected Ceiling Plans for Top Track
Since EBUNGE movable partitions are suspended from a top track, the reflected ceiling plan is critical. It shows the track layout, support structure, and any ceiling pockets. This drawing must align with the floor plan to ensure the partition can move smoothly.
Elevations and Sections
Elevations show the partition in its closed and stacked positions, including the pocket depth and the track height. Sections reveal how the partition integrates with the wall, ceiling, and floor. These drawings are essential for understanding the acoustic seal and the overall aesthetics.

Pass-Door Requirements and Drawings
Many sports halls require a pass-door within the partition for access when the partition is closed. The drawings must specify the door location, swing direction, and hardware. Pass-door requirements can affect the panel width and the stacking pocket size.
Door Integration with Stacking
If the pass-door is within a panel, the drawings must show how the door leaf is handled when the partition stacks. In some cases, the door may need to be removed or folded. Drawings must clarify this to avoid conflicts.
Access and Egress
Pass-doors also serve as emergency egress. The drawings must comply with local building codes, showing clear width and swing direction. Procurement teams should verify that the pass-door meets all safety requirements.
Acoustic and Seal Considerations in Drawings
While EBUNGE does not disclose specific acoustic ratings, drawings often indicate the intended acoustic performance through seal placement and construction details. The concept of STC/Rw is used to describe the sound insulation of a partition, but the actual performance depends on many factors.
Perimeter Seals
Drawings show where perimeter seals are located—at the top, bottom, and vertical edges. These seals are crucial for acoustic performance. The drawings must specify the type of seal and its compression, but final performance should be confirmed with the manufacturer.
Review the full panel travel route and parking footprint before the surrounding layout is finalized.
Acoustic Testing and Documentation
Project documentation may include acoustic test reports. However, these reports are specific to the tested configuration. For your project, you must confirm that the partition meets your acoustic requirements through project-specific support.
Procurement and Documentation Considerations
For procurement, the drawings are part of the tender documents. They help contractors price the work accurately and ensure that all parties understand the scope. The sports hall partition stacking pockets time clock drawings should be included in the specification package.
Reviewing Drawings with the Manufacturer
It is advisable to review your drawings with the partition manufacturer early in the design phase. EBUNGE can provide guidance on stacking pocket dimensions, track layouts, and time clock integration. This collaboration can prevent issues during installation.
Documentation for Approvals
Drawings may need to be submitted for building permits or client approvals. Ensure that all drawings are clear and dimensioned. The documentation should also include a description of the partition system, including the fact that panels are individually movable and park at a planned stacking position.
FAQ: Sports Hall Partition Stacking Pockets and Time Clock Drawings
What are stacking pockets in sports hall partitions?
Stacking pockets are recessed spaces in the wall or ceiling where movable partition panels are stored when not in use. They are designed to house the panels neatly, allowing the hall to be opened up. Drawings must show their exact dimensions and location.
How does a wall-mounted time clock interface work with a partition?
A wall-mounted time clock interface can be used to control when the partition is opened or closed, often for scheduling purposes. It connects to the partition control system, and the drawings must show its location and electrical connections.
What drawings are needed for a sports hall partition?
Typically, you need floor plans, reflected ceiling plans, elevations, sections, and detail drawings. These show the partition layout, stacking pockets, track, and all integration points.
Do EBUNGE partitions require a floor track?
No, EBUNGE movable wall panels are suspended from a top track and cross the opening without a floor track. The drawings should reflect this, showing only the top support.
Can the time clock interface be added to an existing partition?
It may be possible, but it depends on the control system. It is best to specify this in the initial drawings to ensure compatibility. Contact EBUNGE for project-specific advice.
What finish options are available for sports hall partitions?
EBUNGE offers laminate, melamine, fabric, leather, glass, and other approved surfaces. The drawings should indicate the finish for each panel, as this can affect the appearance and maintenance.
For the next planning step, review the related EBUNGE guide, review selected projects and confirm the opening, ceiling condition, layout, finish direction and acoustic requirement for the project.
Conclusion: Bringing It All Together
Specifying sports hall partition stacking pockets time clock drawings is a coordinated effort that involves architectural, electrical, and acoustic considerations. By understanding what these drawings include, procurement teams can ensure that the partition system meets the hall’s operational needs and integrates seamlessly with the building. Early collaboration with the manufacturer is key to a successful project.

For more information on sports hall partitions and to discuss your project’s specific requirements, contact EBUNGE. Our team can help you review your drawings and provide the right solution.
Continue Exploring
More Cost and Planning Guides
- Newer guideWhat Drawings Specify University Auditorium Partition Stacking Pockets with Ceiling-Mounted Light Grids
- Earlier guideWhat Drawings Specify University Training Center Partition Stacking with Ceiling-Mounted Projector Lifts
- Related guideWhat Drawings Specify Community Hall Partition Track at Ceiling-Mounted Ladder Storage Racks
- Related guideWhat Drawings Specify Function Room Partition Stacking Pockets at Ceiling-Mounted Rigging Point Zones